- Repainting of walls (inside and outside of the house) - the landlord was too stingy to cover for this but agreed to keep the rental rates the same for the next 2 years. The paint job will be carried out by my driver.
- Relocation of A/C to the play area/computer desk - in preparation for the hot season, I had the idling second room A/C relocated to the area that my wife and kid spends the most time.
- No more "dripping pee" hot water! - adjusted the settings at the pump so that hot water could be continuous & strong in the bathroom. Changed the hose that was crumpled (limiting water flow) as well.




This will be my final post before I leave for my 2 week vacation in Cairns tomorrow. We be back after Christmas, see you after that and have a very Merry 2008 Xmas!!
